34/034/0#ALL5S&IRST$/./42%452.4/34/2%&ORIMMEDIATEHELPWITHASSEMBLYORPRODUCTINFORMATIONCALLOURTOLLFREENUMBER
8DOORFLOOR LEVELING OPTIONSThere are multiple ways to level your oor frame. Our recommended leveling method is shown below.Leveling materials are no
9CONCRETE FOUNDATIONYour kit contains all materials to construct a wooden oor. If you choose to install your kiton a concrete slab refer to the diag
1093" (236 cm) 96" (244 cm) 144" (366 cm) 120" (305 cm) 96" (244 cm) 96" (244 cm) 72" (183 cm) 48" (122 cm) 24
11DOORFINISH5LEVEL AND SQUARE FLOOR FRAMEBefore attaching oor decking, it is important to level and square the oor frame.A level and square oor
12FLOOR PANELS NOT INCLUDED. SEE PAGE 7 FOR PANEL SIZESAND QUANTITIES.48"(122 cm)144"(366 cm)6"(15 cm)DOORMove to the opposite side. Us
1348"(122 cm)48"(122 cm)144"(366 cm)6"(15 cm)12"(30) cmDOORPARTS REQUIRED:FINISH7You have nished attaching your oor panel
14DOORDOORBack wallFront wallSide wallSide WallCheck the Á oor frame is level after installing Á oor panels.Re-level if needed.HINT:IMPORTANT!• The Á
SIDE WALL FRAMESPARTS REQUIRED:144” (366 cm)120” (305 cm)96” (244 cm)96” (244 cm)72” (183 cm)48” (122 cm)48” (122 cm)48” (122 cm)24” (61 cm)78-1/2” (1
16SIDE WALL PANELS48 x 84"122 x 213 cm)PARTS REQUIRED:x12" (5 cm) x45Fig. BFig. A1-1/2"(3,8 cm)1-1/2"(3,8 cm)3/4"(1,9 cm)3/4&
171-1/2"(3,8 cm)3/4"(19 mm)48"(122 cm)12"(30 cm)6"(15 cm)Flush1-1/2"(3,8 cm)48"(122 cm)12"(30 cm)6"(15 cm
4HISPAGEINTENTIONALLYLEFTBLANK
1-1/2" (3,8 cm) x11Flush36-1/4"(92 cm)1-1/4"(3,2 cm)1"(2,5 cm)36-1/4"(92 cm)2-1/2"(6,3 cm)2-1/2"(6,3 cm)18BACK WALL
Flush1-1/2" (3,8 cm) x1544-1/4"(112 cm)2-1/2"(6,3 cm)2-1/2"(6,3 cm)2-1/2"(6,3 cm)44-1/4"(112 cm)74-5/8"(189,5 cm)74
1"(2,5 cm)74-5/8"(189,5 cm)12"(30,5 cm)36-1/4"(92 cm)6"(15 cm)201-1/2" (3,8 cm) x26BACK WALLPARTS REQUIRED:2 x 3 x 13&qu
1-1/2"(3,8 cm)1-1/2"(3,8 cm)Flush2-1/2"(6,3 cm)2-1/2"(6,3 cm)212 x 3 x 13" (5 x 7,6 x 33 cm)x1RKBACK WALLPARTS REQUIRED:DOORx
22FRONT WALL FRAMEPARTS REQUIRED:2 x 4 x 64" (5 x 10 x 162,5 cm) UXx12 x 3 x 9" (5 x 7,6 x 23 cm)x1NA1 x 3 x 12" (2,5 x 7,6 x 30,5 cm)x
233" (7,6 cm) x8FRONT WALL FRAMEPARTS REQUIRED:2 x 3 x 82-1/2" (5 x 7,6 x 210 cm) FVx22 x 3 x 84" (5 x 7,6 x 213 cm) x1FWDOORPlace one
24Secure NA with (2) 3" nails (Fig. A).Place two roof panels as temporary supports above frame. Install FR centered as shown with (2) 3" scr
251-1/2" (3,8 cm) x24FRONT WALL PANELSPARTS REQUIRED:1/4" (0,6 cm) BELOW PANELHOLD MEASUREMENT1-1/4" (3,2 cm)1-1/4"(3,2 cm)12"
261-1/2" (3,8 cm) x30FRONT WALL PANELSPARTS REQUIRED:x1DOORx112 x 24"(30,5 x 61 cm)x112 x 24"(30,5 x 61 cm)35Place right panel on front
2 x 3 x 96" (5 x 7,6 x 244 cm) 272" (5 cm) x183" (7,6 cm) x6PARTS REQUIRED (TEMPORARY):2 x 3 x 96" (5 x 7,6 x 244 cm) x1BACK WALL
04/21/2011KEEP THIS MANUAL FOR FUTURE REFERENCEACTUAL FLOOR SIZE IS 96 x 144" (244 x 366 cm)16767BEFORE YOU BEGINIMPORTANT!READ INSTRUCTIONS THOR
3Nail down the bottom plate using two 3" nailsbetween the wall studs.Secure backwall horizontal supports with 3" screws(Fig. E, F) into side
6"(15 cm)Fig. C2" (5 cm) NailFig. D(2) 3" (7,6 cm) ScrewsDOORCenter frontwall on oor side-to-side.Nail the frontwall ush to the
303" (7,6 cm) x8LOFT FRAMEPARTS REQUIRED:x22 x 4 x 96" (5 x 10 x 244 cm) TPFLOORTPLoftSupportSAME MEASUREMENTMarkMarkMeasure the top of back
31SHELF FRAMEPARTS REQUIRED:x12 x 3 x 96" (5 x 7,6 x 244 cm) PT3" (7,6 cm) x43" (7,6 cm) x8NOTE: There will be a gap at the
323" (7,6 cm) x8SHELF FRAMEPARTS REQUIRED:x12 x 3 x 96" (5 x 7,6 x 244 cm) PTFlushFlushFlushPT(2) 3" (7,6 cm)Screws(2) 3" (7,6 cm)
333" (7,6 cm) x4WORKBENCHPARTS REQUIRED:x12 x 3 x 96" (5 x 7,6 x 244 cm) PTMeasure the top of back wall workbench support from oor. Measur
34WORKBENCHPARTS REQUIRED:2" (5 cm) x207/16 x 23-7/8 x 91"(1,1 x 61 x 231 cm)x13" (7,6 cm) x4x12 x 3 x 28-5/8" (5 x 7,6 x 73 cm) F
3544-1/4"(112 cm)44-1/4"(112 cm)Fit panels into gap.FlushCENTERAttention: Load not to exceed 250 lbs evenly distributed across loft.PARTS RE
36PARTS REQUIRED:SHELF PANELSLOFT AND SHELVING CAPACITY2" (5 cm) x40LEFT WALLFlushFlush7/16 x 11-7/8 x 96"(1,1 x 30 x 244 cm)x2Place shelf p
37PARTS REQUIRED:RAFTERS2" (5 cm) x120x106 x 24" (15 x 61 cm)x102 x 4 x 55-3/16" (5 x 10 x 140 cm)AA96”(244 cm)AAAAGLUEHINT:Use Á oor a
2TOOLSSafety! Always use approved safety glasses during assembly.OptionalRequiredHELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders
38FlushEND VIEW24”61 cm24”61 cm24”61 cm24”61 cm24”61 cm24”61 cmMEASUREMENTS ARE TO CENTER OF RAFTERS.MEASUREMENTS ARE FROM INSIDE OF PANELS.3" (7
x42 x 2 x 84" (5 x 5 x 213 cm)39PARTS REQUIRED:TRIM1-1/4" (3,2 cm) x64Trim is Á ush with top of side wall panel.Install metal corner trim
40FlushGABLE TRIMRepeat step 1 to mark all trim.2BEGIN¸1DOORAGx42 x 4 x 59-1/8" (5 x 10 x 150 cm)PARTS REQUIRED:OOx12 x 3 x 69" (5 x 7,6 x 1
HINT:Clamp in position before screwing.41GABLE TRIMFINISH6Position one AG 1-1/2" up from front panel edge and center with panel seam (Fig. A). At
AWx22 x 3 x 41-7/8" (5 x 7,6 x 106 cm)42PARTS REQUIRED:GABLE TRIM1-1/4" (3,2 cm) x24FINISH3BEGINInstall AW level over seam of front wall pan
43DOORMove to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is ush to the peak (Fig
44Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E).Move to the
x3JF1 x 4 x 60" (2,5 x 10 x 152 cm) 45FlushGLUEGLUEFlushJF x3PARTS REQUIRED:COLLAR TIES2" (5 cm) x18FINISH321BEGINPosition and level each J
46Attention: Load not to exceed 250 lbs evenly distributed across loft.LOFT PANELS2" (5 cm) x22Continue nailing 2" nails in each loft panel
4748-3/4” (124 cm) Screws3” (7,6 cm)Screws3” (7,6 cm)96” (244 cm) AN TP TP / ANFlushFlush Screws1-1/4” (3,2 cm)Screws3” (7,6 cm)PARTS REQUIRED:SOFFIT
3COMPLETING YOUR SHEDYou will need these additional materials:OPTIONAL MATERIALSFOUNDATION OR FLOOR MATERIALSADDITIONAL MATERIALSDRIP EDGE ...
48x103/8 x 1-3/4 x 82-1/4" (0,9 x 4,4 x 209 cm)2" (5 cm) x40AN/TPFlushNails2" (5 cm)24”(61 cm)24”(61 cm)24”(61 cm)24”(61 cm)24”(61 cm)
49Orient parts as shown on at surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.PARTS REQUIRED:x1x1Le
50DOOR4PARTS REQUIRED:x13" (7,6 cm) x13DOORSOOFlushagainst wall panels.Fig. AOOOO2 x 3 x 69" (5 x 7,6 x 175,3 cm)Center doors on panel seam
51You have nished reinforcing your doors.DOORPARTS REQUIRED:FINISH2BEGIN1DOORCENTER CENTERCENTERCENTERReinforce the door trim using 3/4" screws
52x210-1/2 x 32-1/2"(27 x 82,5 cm)Approx. 1/2" (1,3 cm)2 Screws 2 ScrewsPARTS REQUIRED:WINDOWSDOORBEGIN¸1Apply high quality exterior-grade c
53ZJx15/8 x 2-1/2 x 72" (1,6 x 6,3 x 183 cm) 2" (5 cm) x14TRIMFlushFlushCENTERDo not nail into window Á ange.Inside FramingMark Center.PARTS
54x35/8 x 2-1/2 x 9" (1,6 x6,3 x 23 cm)EY2" (5 cm) x14PARTS REQUIRED:WINDOW TRIM45Install three EY using 2" nails into framing as shown
55ZJx15/8 x 3 x 72" (1,6 x 7,6 x 183 cm) ZJ Keep aligned. Keep aligned. CAUTION! Do not nail into window Á ange! FlushFlush Flush2" (5 cm
56You have nished installing your door weatherstrips.BEGINWith left door closed, center a weatherstrip OO vertically on the left door in the door op
BEGINWith door closed mark bottom hole location for bolt to extend into.HINT: Extend lower bolt to leave mark in wood. Tap bolt with hammer. Drill 3/
WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size1" x 4"...3/4" x 3-1/2" (1,9 x 8,9 cm)2" x 4"...
581" (25 mm) x21-1/4" (32 mm) x21/2"1,3 cm1-1/2" (3,8 cm)35-3/4"90 cmSIDE VIEWRIGHT DOOR.1-1/2"3,8 cmTOP VIEW 1/4&quo
59• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.
60• Follow directions provided by manufacturer and these instructions.SHINGLES- NOT INCLUDED -Install rst starter row upside down and color up with
61Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge.22FRONT OF SHEDBACK OF SHEDBA
62You have nished shingling your roof. Proceed to capping the ridge.FINISH9Continue installing rows of shingles to the peak. At the peak make sure t
63SHINGLES - RIDGE CAP • You will nish off the top of the roof with a ridge cap made from shingles.Note: • You will need about 28 - 30 cut pieces.
64SHINGLES - RIDGE CAPcontinued...Continue installing ridge cap to back of roof.Make sure there is 4" between the shingle-color and edge of shing
65WARRANTYBackyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for one
SHELFDOOROOx22 x 3 x 69" (5 x 7,6 x 175,3 cm)PARTS LIST continued...x12 x 3 x 28-5/8" (5 x 7,6 x 73 cm) FQx52 x 3 x 96" (5 x 7,6 x 244
x63/8 x 48 x 84"(1 x 122 x 213 cm)WALL PANEL & DOORS PARTS LISTx1 x1 x1 x1x2x2x1LEFT DOORx1RIGHT DOORx3BOXESx4BOXESx110113x70x96x64x20x48NAIL
7FLOOR PANELS (Not Included)You will need oor panels and nails to complete your oor. Floor panel sizes andquantities are shown below.NOTE: Use a m
Kommentare zu diesen Handbüchern